Lubbock Wind Ranch™

ZI8I5269 LOCATION: Lubbock Counties, TX, approximately 2 miles East of  the City of Lubbock

SIZE: 7.5 MW

COMMERCIAL OPERATIONS DATE:

  • PHASE 1: April  2010
  • PHASE 2: Q2 2011

TURBINE EQUIPMENT: 3 Samsung Heavy Industries 2.5 MW 

INTERCONNECT: 12,470 V upgraded distribution circuit

CONTRACTOR: Baker RD Concrete Construction

DEVELOPER: Cielo Wind Services Inc.

OWNER: Lubbock Wind, LLC.

HIGHLIGHTS:

  • Samsung Heavy Industries’ first wind turbine generator

 

ZI8I5016 ZI8I4772 ZI8I4927 Samsung Baker group groundbreaking 11-09